Infrastructure
  • Client: Catalyst Engineering Ltd
  • Main Contractor: GRC UK
  • Arcitect:
  • Engineers: Catalyst Engineering

PDS provided fabrication and GA drawings for Catalyst Engineering to develop the structural steel frames that formed the ticket halls and escalator banks for the new stations at Battersea and Nine elms as part of the Northern Line Extension.